Our Remodeling Process

A Remodeling Process Built Around Your Peace of Mind

From design through construction one team handles everything.

Schedule A Free Discovery Call A 15 minute call with the owner, Paul McManus, to discuss your project and get ballpark pricing before scheduling an in-person consult.
White kitchen with an arched wood door, brass faucet and white shaker cabinets

A Design Build Remodeling Process

One Team, one contract, one streamlined process from start to finish

At McManus, one team handles every step of your project. Our in-house designers and showroom staff work alongside our project managers and craftspeople from day one… not handed off to each other, but genuinely integrated.

The result:

Fewer surprises, a more predictable schedule, and a single warranty that covers everything we touch.

1
1-2 Weeks

Schedule An Estimate

Get a realistic estimate with 3D concept drawings

2
6-8 Weeks

Design & Ordering

We finalize all the details and order all your materials.

3
4-8 Weeks

Preconstruction Planning

Your project team prepare everything for project start.

4
8-10 Weeks

On Site Construction

Project manager is on site daily for quality control.

5
5 Years

Follow Up & Warranty

6 month ‘tune up’ visit and a 5 year warranty on all work.

How Long Does It Take?

The actual construction of a kitchen or bath can take 6 – 12 weeks. But if you include estimate, design and planning the whole process can take 3-4 months.

A typical remodeling timeline looks like this

Week 1 – 2

The initial estimate. We start with a home visit, then invite you into our showroom a week later to review design and budget options

Weeks 3 – 10

Design and planning. Work with our in house design team to finalize layout, storage, material selections and all the details of your project

Weeks 4 – 12

Ordering & permits. We order all your materials in advance, inspect them and store them in our warehouse until needed on site.

3 Weeks before project start

Pre-construction meeting. Your project manager will meet in your home to review project set up, parking, dealing with pets etc…

Weeks 12 – 22

Construction. Your project manager will be on site every day. Kitchen and bath projects can take 6-10 weeks. Whole remodels can take up to 3 months.

5 Years

Warranty and follow up. We provide a 5 year warranty and check in annually to make sure everything is working as expected.

Think Outside the Big Box Store

Big box stores carry materials to meet a price point, not for performance or longevity.

Our showroom has curated selections from boutique vendors and trusted brands that we’ve vetted for durability, appearance, and long-term value.

What You Can Expect

We Plan Every Detail Before Construction Begins

Most remodeling problems trace back to the same mistake: making design decisions and material selections during construction. We resolve all of that upfront. Every finish, every fixture, every dimension is decided during the design process.

We Order Everything in Advance

Once selections are finalized, every material is ordered, inspected, labeled, and stored in our warehouse before construction starts. No waiting on back-ordered tile mid-project. No schedule held hostage by a delayed shipment.

You Have Full Visibility, Start to Finish

All plans, budgets, schedules, and daily progress logs live in our project management software. And you have access to all of it. No wondering what’s happening at your house while you’re at work.

Your Project Manager Is On Site Every Day

Not just checking in occasionally. Every day. They’re doing quality control walkthroughs and sending you a daily progress report so you always know where things stand.

Every project at McManus runs on this process. It’s not just a promise we make, it’s the system we’ve built. And it’s why our clients describe their remodel as the best experience.

Inside Our Project Management Software
Project schedule calendar in Buildertrend

Detailed Project Schedules

Daily progress log in Buildertrend with project photos

Daily Site Visits and Project Reports

Completion checklist in Buildertrend

A Zero Punchlist Approach

Some Common Questions About The Remodeling Process

You can read all our FAQs and access planning tools here.

Do you have to move out during the remodel?

Most of our clients do not. We take great care in making sure your home stays clean and organized during the project so it doesn’t feel like a construction zone. We’ll also send you a guide for how to prepare for your remodel about 3 weeks before project start.

What happens if there is a structural surprise behind the walls?

We always start with a fixed price contract. In the event we discover a hidden condition we would create a change order. No additional work is done without an approved change order.

What is the most disruptive part of a kitchen remodel?

Demolition and early construction phases are usually the most disruptive. But the middle of the project can be the most stressful.

How Much Will It Cost?

Our average project size across all projects is around $85,000. Small bathrooms start at around $45,000. Large kitchens can cost $150,000 or more.

The best way to understand the options and cost for your project is to schedule a design and budget consult. But if you just want some rough cost ranges for different size projects you can click the button below.

Ready to See What Your Project Could Look Like?

Schedule a Design and Budget Consult

What you’ll get:

  • A personal design consult in our showroom
  • 3D drawings to help you visualize options and
  • A ‘good-better-best’ estimate
Good Better Best remodeling estimate with three budget columns
Remodel Without Regret

Set Up Your Discovery Call.

Our remodeling estimates aren't guesses or "good starting points." They're based on real material numbers and historic costs, and include a design consult in our showroom.

This is the right way to start: with a realistic budget and a clear remodeling plan.

If you're struggling with an outdated kitchen or bathroom, schedule a call with the owner, Paul McManus, to discuss options and see if we can help.